DALLAS ISD - ORG 145 STEPHEN C FOSTER ES

Stephen C. Foster Elementary School - Renovation

Status

Bidding Closed

Prebid Date1/17/23 11:00am

Bid Date2/14/23 2:00pm

Company & Contacts

FWHCC
Dallas ISD Procurement Services  
ProcurementCS@dallasisd.org

Location

3700 Clover Ln. Dallas, TX 75220

All digital files included with purchase of complete printed set via file transfer. Specs seperated by section and plans by sheet names.

Half Size Available upon Request

NOTICE: INVITATION TO BID

SCOPE OF WORK:
Scope of Work. The Work consists of:
Org 145 – Stephen C. Foster Elementary School – Renovation
Project consists of the following:
a. Exterior Drainage Improvements.
b. Sidewalk replacement.
c. Northwest Parking lot demo and replacement.
d. Select Roof replacement.
e. New secure vestibule and Reception.
f. Paint all previously painted walls and ceilings.
g. Ceiling tile replacement.
h. Casework/ Millwork replacement in select classrooms.
i. New flooring in corridors and classrooms.
j. HVAC replacement and improvements.
k. Piping to grease trap replacement.
l. Hot water heater replacement.
m. All interior and exterior lighting to be updated to LED fixtures.
n. All Lighting controls to be updated.
o. Fire Alarm central reporting station replacement and all fire alarm devices.
p. Monument sign replacement

BUDGET:
Total Estimated Construction Budget (CCL + Allowances) for CSP CS 207053 $6,847,229.00

PRE-BID DATE AND LOCATION:
A pre-proposal meeting will be held at 11:00 am on Tuesday 01/17/2023 for all interested parties. This
meeting is not mandatory, but the information discussed will be extremely helpful in preparation of the proposal.

Join Zoom Meeting:
https://zoom.us/j/98511260620?pwd=dnUyRVIrNzZ2NzlHamYwTysvUTZZZz09

Meeting ID: 985 1126 0620
Passcode: Gq4jjH

BID-DATE & LOCATION:
All Construction Services construction procurements must be physically delivered to the Construction Services office, at the Linus D. Wright Dallas ISD Administration Building 9400 North Central Expressway, Suite 800 Dallas, TX 75231. (Call 972.925.7200 for directions). Delivery to other locations will result in rejection of a CSP.

Completed CSP Package Part 1-A, 1-B and 1-C are due on Tuesday, 02/14/2023 at 2:00 PM (local time).

Completed CSP Package Part 2 is due on Wednesday, 02/15/2023 at 3:00 PM (local time).

OWNER
Dallas ISD Procurement Services c/o Bond/Construction Services
Linus D. Wright Dallas ISD Administration Building
9400 North Central Expressway, Suite 800
Dallas, TX 75231

OWNER’S PROJECT MANAGER (PM)
Zafar Syed will be the Owner’s Project Manager (PM) for the management of planning, design,
permitting, construction, and post-construction for this CSP. All correspondence and communication during the contract finalization, construction and post-construction processes shall be directed to the Architect/Engineer firm (A/E) with copy to Zafar Syed. During construction, the PM shall have authority to act on behalf of Dallas ISD for Owner related direction.

Zafar Syed, Project Manager
Dallas Independent School District
Construction Services
Linus D. Wright Dallas ISD Administration Building
9400 N. Central Expressway Suite 800
Dallas, TX 75231
Phone: 972-925-7373
E-mail: C264@dallasisd.org

ARCHITECT/ENGINEER FIRM (A/E)
Page Southerland Page
1800 Main Street, Dallas, TX 75201
Main Contact: Mattia Flabiano
Phone: 214 522 3900
Fax: 214 522 4380
Email: pagethink.com

BID METHOD:
Competitive Sealed Proposals