DALLAS ISD - ORG 145 STEPHEN C FOSTER ES
Status
Bidding Closed
Prebid Date | 1/17/23 11:00am |
Bid Date | 2/14/23 2:00pm |
Company & Contacts
Location
3700 Clover Ln. Dallas, TX 75220
All digital files included with purchase of complete printed set via file transfer. Specs seperated by section and plans by sheet names.
Half Size Available upon Request
NOTICE: INVITATION TO BID
SCOPE OF WORK:
Scope of Work. The Work consists of:
Org 145 – Stephen C. Foster Elementary School – Renovation
Project consists of the following:
a. Exterior Drainage Improvements.
b. Sidewalk replacement.
c. Northwest Parking lot demo and replacement.
d. Select Roof replacement.
e. New secure vestibule and Reception.
f. Paint all previously painted walls and ceilings.
g. Ceiling tile replacement.
h. Casework/ Millwork replacement in select classrooms.
i. New flooring in corridors and classrooms.
j. HVAC replacement and improvements.
k. Piping to grease trap replacement.
l. Hot water heater replacement.
m. All interior and exterior lighting to be updated to LED fixtures.
n. All Lighting controls to be updated.
o. Fire Alarm central reporting station replacement and all fire alarm devices.
p. Monument sign replacement
BUDGET:
Total Estimated Construction Budget (CCL + Allowances) for CSP CS 207053 $6,847,229.00
PRE-BID DATE AND LOCATION:
A pre-proposal meeting will be held at 11:00 am on Tuesday 01/17/2023 for all interested parties. This
meeting is not mandatory, but the information discussed will be extremely helpful in preparation of the proposal.
Join Zoom Meeting:
https://zoom.us/j/98511260620?pwd=dnUyRVIrNzZ2NzlHamYwTysvUTZZZz09
Meeting ID: 985 1126 0620
Passcode: Gq4jjH
BID-DATE & LOCATION:
All Construction Services construction procurements must be physically delivered to the Construction Services office, at the Linus D. Wright Dallas ISD Administration Building 9400 North Central Expressway, Suite 800 Dallas, TX 75231. (Call 972.925.7200 for directions). Delivery to other locations will result in rejection of a CSP.
Completed CSP Package Part 1-A, 1-B and 1-C are due on Tuesday, 02/14/2023 at 2:00 PM (local time).
Completed CSP Package Part 2 is due on Wednesday, 02/15/2023 at 3:00 PM (local time).
OWNER
Dallas ISD Procurement Services c/o Bond/Construction Services
Linus D. Wright Dallas ISD Administration Building
9400 North Central Expressway, Suite 800
Dallas, TX 75231
OWNER’S PROJECT MANAGER (PM)
Zafar Syed will be the Owner’s Project Manager (PM) for the management of planning, design,
permitting, construction, and post-construction for this CSP. All correspondence and communication during the contract finalization, construction and post-construction processes shall be directed to the Architect/Engineer firm (A/E) with copy to Zafar Syed. During construction, the PM shall have authority to act on behalf of Dallas ISD for Owner related direction.
Zafar Syed, Project Manager
Dallas Independent School District
Construction Services
Linus D. Wright Dallas ISD Administration Building
9400 N. Central Expressway Suite 800
Dallas, TX 75231
Phone: 972-925-7373
E-mail: C264@dallasisd.org
ARCHITECT/ENGINEER FIRM (A/E)
Page Southerland Page
1800 Main Street, Dallas, TX 75201
Main Contact: Mattia Flabiano
Phone: 214 522 3900
Fax: 214 522 4380
Email: pagethink.com
BID METHOD:
Competitive Sealed Proposals