DALLAS ISD - ORG 118 - ALBERT C. BLACK ES - NEW CONSTRUCTION

New ground-up partly 2 story building, Construction Type IIB. The building includes PreK-Kindergarten, Grade 1 through 5 instruction classroom, science labs, specialty classroom (art, music), Library, Cafeteria/Kitchen, gymnasium. Gymnasium will be the storm shelter. The façade consists of brick masonry and metal panels. It also includes crawl space at kitchen and at al restroom sub-surface plumbing.

Status

Bidding Closed

Prebid Date11/28/22 9:00am

Bid Date1/10/23 2:00pm

Company & Contacts

FWHCC
Dallas ISD Procurement Services  
ProcurementCS@dallasisd.org

Location

Dallas, Texas

All digital files included with purchase of complete printed set via file transfer. Specs seperated by section and plans by sheet names.

Half Size Available upon Request

NOTICE: INVITATION TO BID

SCOPE OF WORK:
The Work consists of:
Org # 118 – Albert C Bushman Elementary School
New ground-up partly 2 story building, Construction Type IIB. The building includes PreK-Kindergarten,
Grade 1st through 5th instruction classroom, science labs, specialty classroom (art, music), Library, Cafeteria/Kitchen, gymnasium. Gymnasium will be the storm shelter. The façade consists of brick masonry and metal panels. It also includes crawl space at kitchen and at al restroom sub-surface plumbing.

BUDGET:
$ 33,834,496

PRE-BID DATE AND LOCATION:
A pre-proposal meeting will be held at 11:30 am on Monday November 14, 2022 at via Zoom Conference for all interested parties. This meeting is not mandatory, but information discussed will be extremely helpful in preparation of the proposal.
Join Zoom Meeting:

Join Zoom Meeting:
https://dallasisd.zoom.us/j/82788018911?pwd=VlFLOFFBTXNDOTUrREo1U0UxU3F4QT09

Meeting ID: 827 8801 8911
Passcode: 552010

BID-DATE & LOCATION:
All Construction Services construction procurements must be physically delivered to the Construction Services office, at the Linus D. Wright Dallas ISD Administration Building 9400 North Central Expressway, Suite 800 Dallas, TX 75231. (Call 972.925.7200 for directions). Delivery to other locations will result in rejection of a CSP.

Completed CSP Package Part 1-A, 1-B and 1-C are due on Wednesday, November 30, 2022 at 2:00 PM (local time).

Completed CSP Package Part 2 is due on Thursday, December 01, 2022 at 3:00 PM (local time).

Any materials received after the respective closing dates / times will not be considered.

OWNER
Dallas ISD Procurement Services c/o Bond/Construction Services
Linus D. Wright Dallas ISD Administration Building
9400 North Central Expressway, Suite 800
Dallas, TX 75231

OWNER’S PROJECT MANAGER (PM)
Sultan Cole, Project Manager
Dallas Independent School District
Construction Services
Linus D. Wright Dallas ISD Administration Building
9400 N. Central Expressway Suite 800
Dallas, TX 75231
Phone: (972) 925 -7259
E-mail: C96754@dallasisd.org

**ARCHITECT/ENGINEER FIRM (A/E) **
HKS, Inc.
350 N. Saint Paul Street
Suite #100
Dallas, TX 75201
Main Contact: Kesha Mehta
Phone: (214) 969-3279
Fax: N/A
Email: kmehta@hksinc.com

BID METHOD:
Competitive Sealed Proposals